The restoration project involves the construction of an outer skin of the building bricks of recovery, so as to minimize the difference with the other buildings in the Old Town and the castle walls below.
It is envisaged the demolition of the floor covering is no longer suitable and reconstruction with steel beams, planks of wood and concrete layer.
The need to find space for the dressing rooms of the players has recommended the creation of a cover over the existing railing, which allows the recovery of four small rooms, bathrooms and related equipment rooms in the attic.